It is standard procedure for U.S. Navy ships to go to sea prior to forecasted heavy weather, such as an approaching hurricane or major storm. However, some ships, such as ships under repair, ships under construction, harbor craft and other vessels may not be able to go to sea. These ships must be securely moored during heavy weather to piers, wharves or Fleet Moorings to ensure safety of the ships and surrounding structures and to prevent loss of life. Therefore, this report: (1) Proposes U.S. Navy heavy weather (Mooring Service Type 3) requirements by region. (Inactive, MSC and MARAD ships are not included in this report). (2) Recommends Navy wide heavy weather environmental design criteria applied to key Navy regions. (3) Provides technical guidance for the analysis, design, construction, and use of heavy weather mooring facilities.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    U.S. Navy Heavy Weather Mooring Criteria


    Beteiligte:
    W. N. Seelig (Autor:in)

    Erscheinungsdatum :

    1999


    Format / Umfang :

    25 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    SPREAD MOORING METHOD FOR WEATHER VANING

    LEE CHANG HYUN | Europäisches Patentamt | 2018

    Freier Zugriff

    SPREAD MOORING METHOD FOR WEATHER VANING

    Europäisches Patentamt | 2024

    Freier Zugriff



    Heavy-load large-working-space mooring robot

    ZHAO TIESHI / YUN XUAN / YANG CHANGBO et al. | Europäisches Patentamt | 2023

    Freier Zugriff