The increasing threat of improvised explosive devices (IED) in Iraq has led to widespread interest by Congress and the public regarding the availability of critical force protection equipment. GAO initiated a series of engagements under the Comptroller General's authority to address these concerns. In March 2006, GAO reported on factors that affected the production and installation of armor for the Army's medium and heavy trucks. This engagement examines issues affecting the production and installation of armor for the Marine Corps' medium and heavy trucks. The objectives were to (1) determine the extent to which truck armor was produced and installed to meet identified requirements, (2) identify what factors affected the time to provide truck armor, and (3) identify what actions the Marine Corps and DOD have taken to improve the timely availability of truck armor.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Defense Logistics: Lack of a Synchronized Approach between the Marine Corps and Army Affected the Timely Production and Installation of Marine Corps Truck Armor


    Erscheinungsdatum :

    2006


    Format / Umfang :

    56 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch