Analyses have been completed that indicate the consideration of spent fuel histories (''burnup credit'') in the design of spent fuel shipping casks is a justifiable concept that would result in cost savings and public risk benefits in the transport of spent nuclear fuel. Since cask capacities could be increased over those of casks without burnup credit, the number of shipments necessary to transport a given amount of fuel could be reduced. Reducing the number of shipments would increase safety benefits by reducing public and occupational exposure to both radiological and nonradiological risks associated with the transport of spent fuel. Economic benefits would include lower in-transit shipping, reduced transportation fleet capital costs, and reduced numbers of cask handling operations at both shipping and receiving facilities. 44 refs., 66 figs., 28 tabs. (ERA citation 12:047204)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Feasibility and Incentives for the Consideration of Spent Fuel Operating Histories in the Criticality Analysis of Spent Fuel Shipping Casks


    Beteiligte:
    T. L. Sanders (Autor:in) / R. M. Westfall (Autor:in) / R. H. Jones (Autor:in)

    Erscheinungsdatum :

    1987


    Format / Umfang :

    240 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Impact Analysis of Spent Nuclear Fuel Shipping Casks

    M. Huerta / A. W. Dennis / R. H. Yoshimura | NTIS | 1978




    Conceptual Designs for LMFBR Spent Fuel Shipping Casks

    G. C. Allen / R. G. Eakes / J. M. Freedman et al. | NTIS | 1978