Topics reviewed include system integration, plant control, the master control subsystem, beam characterization subsystem, the receiver subsystem, the thermal storage subsystem, and the plant support subsystem. (ERA citation 06:023321)
Third Project Design Review (RADL Item 1-5)
1979
250 pages
Report
Keine Angabe
Englisch