The preliminary design, reference program, costs, and sortie and program options for the modular space station are outlined. The Phase B has a barbell configuration baseline with a manipulator. The baseline includes two capability plateaus, a 6-man station followed after five years by growth to a 12-man station. It is concluded that a common development approach is the most cost effective and flexible system. The system includes a module to support automated payload servicing, a set of sortie labs, and the cargo modules, RAMs, and space station modules. These would be developed and operated in conjunction with the space shuttle.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Modular Space Station Phase B Extension NASA Administrators Review


    Erscheinungsdatum :

    1971


    Format / Umfang :

    144 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch