The SIRIO 2 flight model status, launch and orbital phase ground segment, and launch vehicle, composite and range facilities interfaces are reviewed. The satellite design is flight qualified and the flight model is acceptable. System level requirements are met. Nonconformances, deviations, and waivers are adequately dealt with. A set of spares is available, as is launch support equipment. Plans and procedures for the launch campaign are provided.
Sirio 2 Flight Readiness Review
1981
98 pages
Report
Keine Angabe
Englisch
Tema Archiv | 1975
|Sirio - Göteborgs nya spårvagn
IuD Bahn | 2005
|SIRIO: One year of station keeping
NTRS | 1979
|Introduction to the Sirio-2 programme
TIBKAT | 1981
|Sirio repeater designed for SHF experiments
Tema Archiv | 1978
|