This report summarizes our audit of Air Force aircraft corrosion control with emphasis on aircraft painting and paint removal. It is the final Air Force report in a series of reports that resulted from our DoD-wide Audit of Aircraft Paint Application and Removal Capabilities. Other reports resulting from audit discussed the repainting of the C-5 aircraft and construction of a plastic media blasting facility at Laughlin Air Force Base, Texas. The Air Force spends approximately $1 billion a year on its aircraft corrosion control program. Corrosion control costs include both corrosion repair and preventive corrosion maintenance.
Air Force Aircraft Painting and Corrosion Control
1996
35 pages
Report
Keine Angabe
Englisch
Aircraft , Corrosion & Corrosion Inhibition , Coatings, Colorants, & Finishes , Preventive maintenance , Corrosion inhibition , Protective coatings , Transport aircraft , Auditing , Department of Defense , Military facilities , Removal , Military aircraft , Costs , Repair , Media , Paints , Air force facilities , Plastics , Blast , Texas , Air force equipment , Paint removers , Aqi00-03-0666 , C-5 aircraft
Aircraft stripping and painting
Online Contents | 1995
New technology aircraft painting
Tema Archiv | 1989
|U.S. Air Force Aging Aircraft Corrosion
British Library Online Contents | 1996
|NTIS | 1983
|