Results of 17 new borings made along Huntington Route in the National Airport area are summarized in the report. It contains a series of geological sections along the proposed subway, logs of the borings, engineering laboratory test results and conclusions regarding subsoil properties. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren