A description is given of the second problem, a clamped-free truss structure, defined in the GARTEUR Action Group 11. The measured and calculated model data of the structure are correlated, the locations of the errors are determined and finally the finite element model of the structure is updated. These analyses are performed with the B2000 validation processor of the department structures at the National Aerospace Laboratory and the program TANCO of the structures department at Fokker Space and Systems.
Correlation, Error-Localisation and Updating of the Second Problem Defined in GARTEUR AG11
1990
28 pages
Report
Keine Angabe
Englisch
Overview of GARTEUR research programme
Online Contents | 2001
|GARTEUR Helicopter Cooperative Research
Deutsches Zentrum für Luft- und Raumfahrt (DLR) | 2010
|The GARTEUR High Incidence Research Model (HIRM) Benchmark Problem
British Library Conference Proceedings | 1998
|