This work plan serves as the design to remove soil with concentrations of copper and barium above Florida Department of Environmental Protection Residential Soil Cleanup Target Levels in the vicinity where radar station refurbishment activities were conducted.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Soil Interim Measures Work Plan Q6 Radar Station, Q6-0082, Solid Waste Management Unit #112, Location of Concern 3 Kennedy Space Center, Florida


    Beteiligte:
    S. Cobert (Autor:in)

    Erscheinungsdatum :

    2021


    Format / Umfang :

    23 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch