The purpose of the proposed facility is to provide an adequate, modern highway facility connecting I-75 to the city of Walton, Kentucky, and US 25. This project would serve as a replacement for the existing facility which has a substandard grade separation structure over the L and N Railroad. The impact of this project is considered to be minimal. It would require the taking of 4 residences occupied by four families but no businesses or farm buildings would be displaced. Excavation of the earth and cut and fill sections are always a necessity in highway construction. Also, the ambient noise level will probably be increased as a result of the fill section which is elevated to overpass the railroad.
Highway Project Boone County, KY 14 and KY 16, 1-75 to US 25 in Walton, S 749, Kentucky
1971
13 pages
Report
Keine Angabe
Englisch