Cost estimating relationships (CER's) were developed for remotely piloted vehicle (RPV) airframes. A limited data base consisting of drones and RPV's was augmented with airbreathing, preprogrammed missiles. Logarithmic and linear equations were developed where possible using ordinary least squares regression for six categories of cost: engineering, manufacturing labor, tooling, material, development support, and flight test.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    An Extension of Cost Estimating Relationships for Airframes of Remotely Piloted Vehicles


    Beteiligte:
    J. D. High (Autor:in) / H. C. Rose (Autor:in)

    Erscheinungsdatum :

    1974


    Format / Umfang :

    127 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Cost-Estimating Relationships for Aircraft Airframes

    G. S. Levenson / S. M. Barro | NTIS | 1966


    Cost-estimating relationships for aircraft airframes

    United States Air Force Project Rand | TIBKAT | 1972


    Cost-Estimating Relationships for Aircraft Airframes

    G. S. Levenson / H. E. Boren / D. P. Tihansky et al. | NTIS | 1972


    Remotely Piloted Vehicles

    R. Burns / J. Brooks / D. Dickinson | NTIS | 1992


    Remotely Piloted Lighter-Than-Air Vehicles

    Onda, M. / University of Bristol | British Library Conference Proceedings | 1993