The report describes data acquisition by the FRA Measurement Cars and subsequent use of the collected track geometry data by the Bessemer and Lake Erie (B and LE) and the Denver and Rio Grande Western (D and RGW) Railroads. These two railroads, in conjunction with ENSCO, Inc., have prepared the report for the Federal Railroad Administration. The major emphasis of the report is placed on use of the track geometry data by N and LE and D and RGW for immediate maintenance and maintenance planning. Also provided are descriptions of data processing reports, system and measurement repeatability data, and the Track Geometry Measurement System onboard the FRA Measurement Cars.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Acquisition and Use of Track Geometry Data in Maintenance-of-Way Planning


    Beteiligte:
    K. Bradley (Autor:in) / B. Price (Autor:in) / T. Woll (Autor:in) / R. Burnes (Autor:in) / R. Gerber (Autor:in)

    Erscheinungsdatum :

    1975


    Format / Umfang :

    130 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Preparing Track Geometry Data for Automated Maintenance Planning

    Neuhold, Johannes / Vidovic, Ivan / Marschnig, Stefan | ASCE | 2020


    Identify severe track geometry defect combinations for maintenance planning

    Wu, Qing / Azad, Abul Kalam / Cole, Colin et al. | Taylor & Francis Verlag | 2022



    Track Geometry Maintenance Management System

    Trosino, M. J. / Ebersohn, W. / American Railway Engineering and Maintenance of Way Association | British Library Conference Proceedings | 1998


    Cost-effective track geometry maintenance limits

    Arasteh khouy, Iman / Larsson-Kråik, Per-Olof / Nissen, Arne et al. | SAGE Publications | 2016