A feasibility study considering the exploitation of a near Earth asteroid was performed. The power requirements and proposed power systems for the crew vehicle, cargo vehicles, mining and processing equipment are described. A photovoltaic power system was selected to meet the 52.1 kWe and the 3.9 kWe power requirements of the crew and cargo vehicles, respectively. A nuclear power plant using a thermodynamic Rankine cycle with a total mass of 62.1 tons was chosen to provide the 7.225 MWe and the 5.5 MWth required for the mining and processing activities at the asteroid.