The study, presents the results of a Feasibility Study that was conducted to develop and implement a modernization and air traffic control systems upgrade for four airports in Peru. This second volumes is entitled Airport Facilities. It is divided into: (1) Introduction; (2) Existing Conditions; (3) Aviation Forecasts-General Overview; (4) Demand/Capacity Analysis-General Overview; (5) Facility Requirements-General Overview; (6) Alternatives/Development Plans-Overview; (7) Airport Layout Plan; (8) Cost Opinion-Summary; (9) Implementation Plan; and (10) Appendices.
Feasibility Study. Airport Modernization and Air Traffic Control Systems Upgrade. Republic of Peru. Volume 1. Airport Facilities
1996
762 pages
Report
Keine Angabe
Englisch
Civil Engineering , Air Transportation , International Commerce, Marketing, & Economics , Air traffic control , Airport terminals , Alternatives , Cost estimation , Export trade information , Feasibility studies , Implementation , Market research , Peru , Requirements , Terminal facilities , Traffic capacity , Traffic volume , Transportation planning , Travel demand , Trip forecasting , Upgrading
Economic airport traffic facilities
Engineering Index Backfile | 1929
|Telephone facilities for airport traffic control
Engineering Index Backfile | 1940
|