This document defines the Upgrade Precision Runway Monitor (Upgrade PRM) Operational and Integration tests that will be conducted at the Federal Aviation Administration (FAA) Operational facilities. These tests will be executed at Raleigh-Durham Airport (RDU) following the Contractor Site Acceptance Test. The Upgrade PRM test configuration is addressed in conjunction with the associated interfaces which will be required to perform the testing in as near an operational environment as possible. The Air Traffic (AT) Operational requirements and test objectives are contained in this test plan. In addition to providing requirements traceability, this plan contains a description of the tests which will be executed, associated success criteria, roles and responsibilities of test personnel, and the overall flow of activities required for a successful test program.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Upgrade Precision Runway Monitor (PRM) Operational Test And Evaluation (OT and E) Test Plan


    Beteiligte:
    R. Astillero (Autor:in) / T. Bratton (Autor:in) / C. Dudas (Autor:in) / J. Livings (Autor:in)

    Erscheinungsdatum :

    1992


    Format / Umfang :

    41 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch








    Operational Tests Of The Precision Runway Monitor At Raleigh-Durham Airport

    Allen, D. P. / Vickers, T. K. | British Library Conference Proceedings | 1990