The Plan has the following objectives: Develop facilities to assure continued use of rail and generate increased shipment, by railroad, of commodities into and out of Madison; Development and location of all river port facilities within the designated zoned riverfront industrial area which would be under the control of the Port Authority; and Develop an industrial park on the hilltop to compliment the intermodal transportation system.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Riverport and Transportation Plan for the City of Madison Port Authority, Madison, Indiana. Final Preliminary Plan (Revised)


    Erscheinungsdatum :

    1981


    Format / Umfang :

    45 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Fort Madison Bridge

    Curtis, W.W. | Engineering Index Backfile | 1889


    Fort Madison Bridge

    Curtis, W.W. | Engineering Index Backfile | 1888


    Madison, South Dakota

    Von Bongart, B.J. | Engineering Index Backfile | 1938


    Madison, South Dakota

    Von Bongart, B.J. | Engineering Index Backfile | 1938


    High Injury Network: City of Madison, Wisconsin

    Claros, Boris / Bill, Andrea / Noyce, David A. | ASCE | 2022