The Chesapeake Division, Naval Facilities Engineering Command (CHESNAVFACENGCOM) has been tasked to install a mooring in the Frederiksted, St. Croix area to be used in place of the pier while the pier is being repaired. The Ocean Construction Platform (OCP) SEACON will be the installation vessel. This report describes the scope of this project including: CHESNAVFACENGCOM; Underwater Construction Team; St. Croix Underwater Tracking Range; NAVSTA Roosevelt Roads and TRACOR Marine Responsibilities; Safety Responsibilities and Personal Safety Equipment; Environmental Conditions; Mooring Description; and Design Criteria. A project schedule includes; Pre-Installation Inventory Inspection; Roosevelt Roads Mobilization; Navigation for Mooring Installation; Installation of Marker Buoys; Installation of the Propellant Embedment Anchor; The Chain Installation; Buoy Location; and Post Installation Tasks. (Keywords: Fleet Moorings).
Saint Croix Fleet Mooring Project Execution Plan
1985
62 pages
Report
Keine Angabe
Englisch
Marine Engineering , Ocean Sciences & Technology , Civil Engineering , Fleets(Ships) , Mooring , Inspection , Installation , Scheduling , Virgin islands , Anchors , Buoys , Chains , Construction , Embedding , Inventory , Markers , Mobilization , Navigation , Oceans , Piers , Platforms , Position(Location) , Propellants , Range(Distance) , Ships , Teams(Personnel) , Underwater construction , Underwater tracking , Saint Croix Island
NTIS | 1984
|Project Execution Plan for 1978 SQUAW Mooring
NTIS | 1978
Genesis Spar Hull and Mooring System: Project Execution
British Library Conference Proceedings | 1999
|