The report presents the initial stages of developing analytical techniques for evaluating design and/or control improvement plans on a freeway-corridor basis. It describes the proposed structure of the freeway-corridor model and the first generation version of a major arterial street model (called the MART1 model). Views on control strategies and design improvements are introduced within the corridor framework. Plans for future research are included.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Freeway Operations Study-Phase III. Progress Toward a Freeway Corridor Model


    Beteiligte:
    M. P. Orthlieb (Autor:in) / S. Roedder (Autor:in) / A. D. May (Autor:in)

    Erscheinungsdatum :

    1973


    Format / Umfang :

    155 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch






    Freeway Corridor Management

    C. L. Dudek / G. L. Ullman | NTIS | 1992


    The FREQ3 Freeway Model. Freeway Operations Study. Phase III

    W. A. Stock / R. C. Blankenhorn / A. D. May | NTIS | 1973