The report describes the installation of ten breakaway timber utility poles in Lexington, Kentucky. Installations were made by Kentucky Utilities Company personnel and monitoring has been performed by Kentucky Transportation Center investigators. Retrofit hardware is described and locations of modified poles are detailed. Modified poles have not been struck by vehicles during the monitoring period.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Breakaway Timber Utility Pole Installations in Kentucky, January 1994


    Beteiligte:
    R. D. Hughes (Autor:in)

    Erscheinungsdatum :

    1994


    Format / Umfang :

    34 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Development of breakaway utility poles

    Labra, JohnT. | Elsevier | 1980



    BREAKAWAY CONTROL DEVICE AND BREAKAWAY CONTROL METHOD

    SUGANO TAKESHI / TAKAE YASUHIKO | Europäisches Patentamt | 2018

    Freier Zugriff

    Breakaway Pulley

    FAYAL ANDREW | Europäisches Patentamt | 2015

    Freier Zugriff