The purpose of the study is to provide a four-lane freeway for U.S.R. 30 in East Liverpool, Ohio, from the end of the present freeway to a connection with a new bridge over the Ohio River, now under construction by West Virginia. Also to provide a four lane freeway for S.R. 39, from the connection to the new bridge to Park Way, in the City. (Author)
Ohio. Project U-457(14), U-431(21), City of East Liverpool
1971
18 pages
Report
Keine Angabe
Englisch
SLUB | 2011
|Online Contents | 1998
|Liverpool. The Liverpool overhead
Engineering Index Backfile | 1928
The 20-minute city: An equity analysis of Liverpool City Region
Elsevier | 2021
|