The Marine Railway, Charleston Naval Shipyard, Charleston Massachusetts is a docking facility 653 feet long, 42 feet wide with a 352-foot-long cradle. Constructed in 1919, the Marine railway was used thoughout this century in repairs of ships ranging from the navy yard tugs to submarines. This report presents the architectural background of the structure as it relates to the construction and maintenance of the facility.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Historic Structure Report: Marine Railway No. 11, Architectural Data Section, Charleston Navy Yard. Boston National Historical Park, Boston, Massachusetts


    Beteiligte:
    M. J. Brady (Autor:in)

    Erscheinungsdatum :

    1982


    Format / Umfang :

    94 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch






    New Construction at the Boston Navy Yard 1941-1945

    Kern, D.H. | Online Contents | 1996


    Field Data Collection Report: Boston Harbor Project, Massachusetts

    Fagerburg, Timothy L. / Coleman, Clara J. / Fisackerly, George M. | HENRY – Bundesanstalt für Wasserbau (BAW) | 1991

    Freier Zugriff

    Port of Boston, Massachusetts

    Engineering Index Backfile | 1937