The system safety analyses and requirements developed for the modular space station during the phase B extension are reviewed. Residual hazards and unresolved safety issues are summarized. Hazards resulting from equipment failures or malfunctions, operations, or credible accidents are identified and evaluated. Special safety trade studies are presented. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Modular Space Station Phase B Extension


    Erscheinungsdatum :

    1971


    Format / Umfang :

    100 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Modular Space Station Phase B Extension

    E. G. Cole / R. A. Berglund | NTIS | 1971


    Modular space station Phase B extension

    Cole, E. G. / Berglund, R. A. | NTRS | 1971