The project is located on the leeward side of Oahu in the vicinity of the communities of Waianae and Makaha. It is essentially a limited realignment of the existing Farrington Highway to a mauka location. It is the initial phase of a larger project to realign the entire coastal Farrington Highway. The right-of-way will have to be cleared and grubbed for highway construction. Pavements will replace some plant life. The newly constructed realignment and connecting road will intrude visually until the landscaping is developed. Some homes will be removed from the right-of-way. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Farrington Highway Realignment, Makaha Section, Oahu, Hawaii


    Erscheinungsdatum :

    1971


    Format / Umfang :

    25 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch