This report, conducted by Advanced Management Technology, Inc., was funded by the U.S. Trade and Development Agency. The study focused on the capability of Chile to modernize their air traffic control system with the advanced technology of Communications, Navigation, Surveillance/Air Traffic Management. This is Volume 1 and it consists of the following tasks: (1) World Wide Survey of CNS/ATM Implementation; (2) Assessment of Chilean Infrastructure for CNS/ATM; (3) Systems Requirement Document; (4) Evaluate Current Infrastructure Funding Mechanisms; (5) CNS/ATM Alternative Analysis; (6) Gauging the Environmental Impact; (7) Technology Options and Transition Schedules; (8) Analyzing Financial Options. In addition to the Tasks, the Executive Summary and the Conclusion are also provided.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    CNS/ATM Aviation Project Feasibility Study


    Erscheinungsdatum :

    1998


    Format / Umfang :

    600 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch







    Aviation project management

    Flouris, Triant G. / Lock, Dennis | TIBKAT | 2008


    Sidestick controllers for general aviation aircraft - A feasibility study

    HERRERA, A. / DOWNWING, D. / ROSKAM, J. | AIAA | 1984