All requirements necessary to demonstrate the acceptability of the total system of the optical test bench for the X-ray telescope test facility are listed including its motor drives, its electrical control system and the optical alignment system. The procedures cover all modes of operations during checkout of the system at the initial trial assembly of all components at the manufacturer's facilities as well as after the final installation of the system at Marshall Space Flight Center.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Acceptance Test Procedure Optical Test Bench and Alignment System. X-Ray Test Facility


    Beteiligte:
    D. S. Winans (Autor:in)

    Erscheinungsdatum :

    1975


    Format / Umfang :

    74 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    MIT upgrade acceptance test procedure

    A. C. Zuehlke | NTIS | 1994





    TRANSPORT FACILITY TEST PROCEDURE (VERSIONS)

    BLJANKINSHTEJN IGOR MIKHAJLOVICH / BOJARKIN SERGEJ VALENTINOVICH / KOVALEV VALERIJ ALEKSANDROVICH | Europäisches Patentamt | 2016

    Freier Zugriff