This is a report of the progress made by the contractor at the midpoint of the period of performance of Delivery Order Number 1. The delivery order requires production of a configuration management standard and a transition and implementation standard for use at the Missile Systems Software Center, U.S. Army Missile R and D Command. The period covered by this report is 20 March 1979 through 18 May 1979. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Configuration Management and Software Acquisition Support


    Beteiligte:
    J. Cross (Autor:in)

    Erscheinungsdatum :

    1979


    Format / Umfang :

    11 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch