This test plan describes the Tennessee Valley Authority (TVA) approach to testing electric vehicle (EV) batteries. Each individual module and vehicle battery pack is given an identification that is traceable through its history. Computer-controlled battery capacity testing equipment is used at the Electric Vehicle Test Facility. Two types of testing are performed - acceptance and operational. Records of tests are maintained on the forms illustrated and on computer-generated outputs shown. The results of the testing is documented in a report on individual battery products of a manufacturer. (ERA citation 08:000654)
Battery Test Plan
1982
30 pages
Report
Keine Angabe
Englisch
Electric Vehicle Battery Test Plan and Results
NTIS | 1984
|BATTERY REPLACEMENT PLAN GENERATION SYSTEM AND BATTERY REPLACEMENT PLAN GENERATION METHOD
Europäisches Patentamt | 2023
|NTRS | 2001
|NTIS | 2014
|