The objective of the materiel test procedure is to determine, under simulated tactical conditions, whether the mission performance of the rocket and guided missile loading rack satisfies army requirements. (Author)
Loading Rack, Rocket and Guided Missile
1970
19 pages
Report
Keine Angabe
Englisch
Guided missile rocket power plant design and installation problems
Engineering Index Backfile | 1947
|NTIS | 1960
|Engineering Index Backfile | 1948
|Kit, Winterization, Missile and Rocket
NTIS | 1970