Long-pulse, megawatt-class gyrotrons operate in very high-order modes. In order to excite only the desired mode in the presence of competing modes in such a gyrotron, the design should take into account the start-up scenario. In this paper the start-up scenario in the 140 GHz, 1 MW gyrotron developed at CPI is described. Simulations were done with the use of self-consistent non-stationary code MAGY.
Start-up scenario in a 140 GHz gyrotron
01.01.2002
125716 byte
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Start-Up Scenario in a 140 GHz Gyrotron
British Library Conference Proceedings | 2002
|Hydrogen energy network start-up scenario
AIAA | 1994
|Hydrogen Energy Network Start-Up Scenario
British Library Conference Proceedings | 1994
|British Library Online Contents | 2003
|IEEE | 2006
|