The Transrapid MagLev had been under development in West Germany for a number of years under the sponsorship of the Ministry of Research and Technology. Following a number of experimental and demonstration vehicles, two prototype 250MPH 100-passenger inter-city vehicles, TRO6, were built, along with an elaborate 20-mile test facility where revenue service can be simulated. Following a period of initial testing by the Transrapid consortium, the operation of the test facility was turned over to a consortium of the German airlines (Lufthansa), German railroad (DB) and a testing house. This consortium is evaluating the suitability of the Transrapid MagLev for revenue service under the complete range of operating conditions. At this time, approximately 200 runs have been made, for a total of 7,000 miles at speeds up to 220MPH (the maximum achievable until the completion of the southern loop.)


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Transrapid MagLev Update


    Beteiligte:


    Erscheinungsdatum :

    01.02.1987


    Format / Umfang :

    837091 byte




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Update on TRANSRAPID MAGLEV

    Dickhart, W.W. | Tema Archiv | 1986


    The Transrapid Maglev System - An Update

    Dickhart, William W. | SAE Technical Papers | 1992


    The Transrapid Maglev system - an update

    Dickart,W.W. / Transrapid International,US | Kraftfahrwesen | 1992


    The Transrapid maglev system

    Dickhart,W.W. / Transrapid International,DE | Kraftfahrwesen | 1989


    The Transrapid Maglev System

    Dickhart, William W. | SAE Technical Papers | 1989