Cost of ownership is always a hot topic when making a program decision for any new, upgrade, or sustainment option. The criteria for developing a Total Cost of Ownership (TCO) model quickly turns into debates with many facets and lots of emotion. When it comes to the cost of acquiring and operating test equipment, the answer is not any easier to determine. However, if looked at from a Product Life Cycle (PLC) cost or a Performance-Based Logistic (PBL) view point, a more accurate cost model can be developed. By understanding and using the attributes of direct and indirect costs for acquiring, operating, maintaining, migrating, and disposing of these assets, an accurate model of the total cost of ownership can be obtained. This will lay out the PLC/PBL costs of test equipment and walk through a TCO model that can be used for making trade-off decisions between different program options.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    The real “Total Cost of Ownership” of your test equipment


    Beteiligte:
    Lycette, B (Autor:in) / Lowenstein, D (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    2011-01-01


    Format / Umfang :

    1846531 byte




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch





    Total Cost of Ownership (TOC)

    Valerdi, Ricardo / Ryan, Thomas R. Jr. | Wiley | 2016



    Simulation Tool For Predicting Warranty and Total Ownership Cost

    Nasser, A. Lorenz / Dey, Animesh / Tryon, Robert | SAE Technical Papers | 2002