This paper describes the application of an automated planning and scheduling system to the NASA Earth Orbiting 1 (EO-1) mission. The planning system, ASPEN, is used to autonomously schedule the daily activities of the satellite. The satellite and operations constraints are encoded within a software model used by the planner. This paper includes a description of the planning system and the associated modeling language. We then discuss how we encoded the EO-1 spacecraft operations with the modeling language. We conclude with a description of the end-to-end planning system as we envision it for EO-1.
Using ASPEN to automate EO-1 activity planning
1998 IEEE Aerospace Conference Proceedings (Cat. No.98TH8339) ; 3 ; 145-152 vol.3
01.01.1998
876848 byte
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Using ASPEN to Automate EO-1 Activity Planning
NTRS | 1998
|Using ASPEN to Automate EO-1 Activity Planning
British Library Conference Proceedings | 1998
|ASPEN: EO-1 Mission Activity Planning Made Easy
NTRS | 1997
|Emerald Group Publishing | 2018
|