Usually, no one consideration over the workforce is having in account to schedule a set of jobs that have to be done. So processing times are assumed to be constant over the planning period for all jobs. However, in the hand-intensive manufacturing systems exist special condition that need to be treated to ensure a safe and reliable labor. This work addressed the problem to schedule a set of jobs to a group of identical workers, with the condition that them productivity rate is affected from the execution of one job to another. This effect is known as “deteriorating job”. A mathematical linear model is developed for the problem with two objects that are evaluated separately. The first objective function is to find a schedule that minimizes the makespan, and the second function objective minimize the maximum tardiness. The mathematical model is tested with random generated instances and a new lower bound for makespan in the multiple-worker case is proposed.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Workforce scheduling with social responsibility considerations




    Erscheinungsdatum :

    01.05.2015


    Format / Umfang :

    379845 byte




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Workforce considerations: maintenance of the future ATC system

    Mason, R.E. / Hsiao, T.T. | Tema Archiv | 1989



    Corporate Social Responsibility

    Thannisch, Rainald | IuD Bahn | 2009


    Seafarer and Social Responsibility

    Hemmi, S. | British Library Online Contents | 2013


    Social responsibility of engineering

    Murakami, Y. | British Library Online Contents | 1998