The modern shipboard power system integrates heavy loads and has less fault tolerance than the conventional power system. Therefore, a fast and high-performance reconfiguration scheme is needed when a fault occurs. In this paper, a two-step reconfiguration method is proposed to achieve a rapid and optimal reconfiguration scheme for shipboard power system. This method at first employs graph theory to generate an emergency reconfiguration which can quickly restore the system with relaxed operation constraints. Then, the particle swarm optimization (PSO) algorithm is used to improve the reconfiguration scheme while considering multiple objectives and stringent constraints.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    A two-step method for reconfiguration of shipboard power system


    Beteiligte:
    Wenqin Xue, (Autor:in) / Yong Fu, (Autor:in)


    Erscheinungsdatum :

    01.04.2011


    Format / Umfang :

    676478 byte




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Perspectives on Power System Reconfiguration for Shipboard Applications

    Nagaraj, Keerthi C. / Carroll, Johnson / Rosenwinkel, Thomas et al. | IEEE | 2007


    Real-time implementation of MVDC shipboard power system reconfiguration

    Babaei, Maziar / Jafari-Marandi, Ruholla / Abdelwahed, Sherif | IEEE | 2017


    Situation and prospects of shipboard integrated power system reconfiguration technology

    Zhengzhuo LIANG / Wanlu ZHU / Zhiyu ZHU et al. | DOAJ | 2022

    Freier Zugriff

    Practical Considerations in Implementing Shipboard Power System Reconfiguration Control Schemes

    Shasteen, Michael / Davey, Kent / Longoria, Raul et al. | IEEE | 2007