Hughes space and communications was awarded a contract in January 1998 from NASA's Goddard Space Flight Center for the design, manufacture, integration and launch of two next generation geostationary operational environmental satellites (GOES) and options for two additional satellites. The satellites measure weather phenomena as the primary mission and X-rays and charged particles as the secondary missions. This paper describes the GOES electrical power subsystem (EPS) requirements, architecture, hardware and energy balance analysis. As of this writing, the design of the EPS has completed the critical design review phase and the hardware has entered the manufacturing phase.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Next generation GOES satellite power subsystem


    Beteiligte:
    Krummann, W. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    2001-04-01


    Format / Umfang :

    420890 byte




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Articles - Next GOES Satellite Power

    Krummann | Online Contents | 2001


    GOES (Geostationary Operational Environmental Satellite)-Next Overview

    A. Schwalb / D. Cotter / J. Hussey | NTIS | 1985


    Next Generation Geostationary Operational Environmental Satellite (GOES-R Series): A Space Segment Overview

    Krimchansky, Alexander / Machi, Dino / Cauffman, Sandra A. et al. | NTRS | 2004


    Electrical Power Subsystem of Globalstar 2^n^d Generation Satellite

    Colas, E. / European Space Agency | British Library Conference Proceedings | 2011