In China, because of the existing of relative weakness, unreasonable structure and the serious resources limitation in transmission network capacity, transmission congestion problem is easier to arise under the circumstance of complete openness of transmission network. Under spot pricing based on pool electrical market in China, a suitable solution to transmission congestion is put forward. According to the contribution of each region to merchandise surplus in system, the solution assigns the merchandise surplus created by transmission congestion to different congestion regions with reason. The transmission line is extended and developed, and the power network is improved. And finally, the transmission congestion problem is solved essentially. At the same time, the autoregulation of electrical market relieves the occurrence of transmission congestion.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Congestion Management of Pool Model in China Power Market


    Beteiligte:
    Du, Wei (Autor:in) / Wang, Yanjun (Autor:in) / Guo, Lirui (Autor:in)


    Erscheinungsdatum :

    01.10.2008


    Format / Umfang :

    282398 byte




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch





    CONGESTION MANAGEMENT APPARATUS AND CONGESTION MANAGEMENT METHOD

    IKEDA TAKURO / KITAGAWA EIJI / SHARMA VISHAL | Europäisches Patentamt | 2019

    Freier Zugriff

    Congestion management apparatus and congestion management method

    IKEDA TAKURO / KITAGAWA EIJI / SHARMA VISHAL | Europäisches Patentamt | 2021

    Freier Zugriff