A study was conducted to determine the initial launch site requirements necessary to support a human mission to Mars. The Design Reference Mission 3.0 (DRM 3.0)/sup [1]/ was used to provide a baseline mission architecture. In addition, two launch vehicle configurations were evaluated; a partially reusable launch vehicle and a completely reusable two stage to orbit concept. The study concluded that the current mission architecture requiring launches every 30 days can be optimized in order to realize significant cost reductions for facility infrastructure at the launch site. Launch site considerations and mission architecture changes were identified that will reduce the infrastructure costs associated with launch site processing as well as reduce and simplify ground checkout.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Ground operations considerations for design of human missions to Mars


    Beteiligte:
    Campbell, J. (Autor:in) / Smith, T.H. (Autor:in)


    Erscheinungsdatum :

    01.01.2000


    Format / Umfang :

    804233 byte





    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Ground Operations Considerations for Design of Human Missions to Mars

    Campbell, J. / Smith, T. H. / Institute of Electrical and Electronics Engineers | British Library Conference Proceedings | 2000




    Internet-based Ground Operations for Mars Lander and Rover Missions

    Backes, P. / Tso, K. / Norris, J. et al. | NTRS | 2000


    Human-Robotic Missions to the Moon and Mars: Operations Design Implications

    Mishkin, Andrew / Lee, Young / Korth, David et al. | IEEE | 2007