Metro has been proved to be the most efficient public urban transportation way. To support daily operation, Clearance house system of auto fare collection (AFC) system should be operated continuously. Beijing metro introduces operation support for clearance house system. Then the thesis elaborates general goal, basic approach, scope, frame work and key performance indicator of operation support. After 7 years practice, it is proved to be suitable operation support for Beijing metro.
Operation support of Beijing metro automatic fare collection system clearance house system
01.07.2016
820580 byte
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
The Research and Application of Automatic Fare Collection System in Tianjin Metro
Trans Tech Publications | 2013
|IuD Bahn
|NTIS | 1972
|British Library Conference Proceedings | 2001
|