The Environmental Development Testing program supported the development test efforts of the Mars 2020 Sampling and Caching Subsystem from May to November 2015. The engineering prototype Brassboard Corer was attached to a five degree-of-freedom robotic arm to execute a 96-test matrix of ambient and low pressure tests in the 10 ft. thermal vacuum chamber at the NASA Jet Propulsion Laboratory, California Institute of Technology. The Pretest, Test, and Post Test procedures are described, and some preliminary results are discussed. Data and observations from this test campaign inform the future development of the software and hardware toward the Mars 2020 flight design, including the next iteration of the rock coring drill, the Engineering Development Unit Corer.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Mars 2020 sampling and caching subsystem environmental development testing and preliminary results


    Beteiligte:
    Chu, Lauren E. (Autor:in) / Brown, Kyle M. (Autor:in) / Kriechbaum, Kristo (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    01.03.2017


    Format / Umfang :

    1974971 byte




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch