This paper proposes a framework for integrating scheduling between arrival, departure, and surface operations to address the drawbacks of domain segregated scheduling. The framework organizes scheduling tasks by time horizon rather than domain. The four-level framework hierarchy includes the configuration schedule, flight schedule, flight schedule update, and schedule conformance. Current NASA research gaps within this framework are discussed and key areas are proposed where future research should focus to facilitate scheduler integration.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    A framework for integrating arrival, departure, and surface operations scheduling


    Beteiligte:


    Erscheinungsdatum :

    01.10.2014


    Format / Umfang :

    972269 byte




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Benefits assessment of integrating arrival, departure, and surface operations with ATD-2

    Saraf, Adltya / Sui, Valerie / Chan, Kennis et al. | IEEE | 2017


    Reasonable scheduling for arrival–departure track operations in railway stations

    Lei, Dingyou / Guo, Chuijiang / Zhang, Yinggui et al. | Taylor & Francis Verlag | 2016



    Joint Arrival-Departure Taxiway Scheduling Considering Departure Uncertainty

    Zhang, Yi / Zhang, Yicheng / Zhang, Sheng et al. | IEEE | 2023