In urban railway operation, many different types of problems and malfunctions may cause disruptions during operation. This paper addresses two recovery modes during disruptions in urban railway operation. In order to compare these modes, two criteria including (1) total travel time of passengers during degraded mode, and (2) the number of non-serviced passengers, are determined. In order to compute the number of non-serviced passengers, some new formulas are proposed. At the end, the necessary remarks are suggested for urban railway operators to simply decide each of these recovery modes, as well as the scheduling patterns based on the disruption conditions. The results are tested and analyzed considering a real case study.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Urban Railway Operation Recovery During Disruption


    Beteiligte:


    Erscheinungsdatum :

    01.09.2015


    Format / Umfang :

    722932 byte





    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Integrated train and passenger disruption management for urban railway lines

    Besinovic, Nikola / Wang, Yihui / Zhu, Songwei et al. | IEEE | 2019


    Unplanned Disruption Analysis and Impact Modeling in Urban Railway Systems

    Chen, Xin / Ma, Zhenliang / Li, Zhibin | Transportation Research Record | 2022


    Unplanned Disruption Analysis in Urban Railway Systems Using Smart Card Data

    Liu, Tianyou / Ma, Zhenliang / Koutsopoulos, Haris N. | Springer Verlag | 2021

    Freier Zugriff

    Design of collaborative multimodal strategies for disruption management in urban railway systems

    Consilvio, Alice / Febbraro, Angela Di / Moretti, Valentina et al. | IEEE | 2020


    Disruption handling in large railway networks

    Corman, F. / D Ariano, A. / Hansen, I.A. | British Library Conference Proceedings | 2010