The use of IEEE 802.11p for supporting intelligent transportation systems (ITS) allows a wide spectrum of applications providing vehicle occupants useful information related to public safety and road efficiency. The Wireless Access for Vehicular Environment (WAVE) standard is specifically tailored for delivering safety and multimedia messages in a highly dynamic vehicular communication environment. Such dynamic characteristics along with the delay-critical nature of safety services turn the medium access control protocol (MAC) timings very important. Therefore, it becomes of great interest to analyze a major performance metric, the end-to-end delay.
On the end-to-end delay analysis for an IEEE 802.11P/WAVE protocol
2011-11-01
255802 byte
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
IEEE 802.11p unicast considered harmful
IEEE | 2015
|Channel estimation schemes for IEEE 802.11p standard
Online Contents | 2013
|British Library Conference Proceedings | 2013
|