When a fault occurs in power distribution system, Distribution Management System (DMS) isolates the fault immediately. Then the load outside the faulty point has to be restored. As the distribution lines and devices have load limits, a simple restoration by closing the normally open switch can not restore all the loads when the distribution system is in a heavy load condition. Normally heuristic methods are used to solve the problem, but they can not guarantee the optimal solution and are complex and time consuming. A restoration switching algorithm which utilizes front root traversal can search the feeder tree to find the transfer routes which can maximum the restore load, then merge the transfer routes and get the solution that have the minimum operations. This method can make the service restoration through load transfer as much as possible with minimum operation by a fast and simple way and can be utilized in real-time application.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Service Restoration Algorithm of Distribution Power System


    Beteiligte:
    Huang, Xiaoyun (Autor:in)


    Erscheinungsdatum :

    12.10.2022


    Format / Umfang :

    1292033 byte




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch