Under the Monitoring Completed Coastal Projects Program, an assessment of shore-connected breakwaters and channel improvements at Cattaraugus Creek Harbor, New York, was performed. Data collection for the monitoring effort occurred from mid-1983 through 1985. An evaluation of waves, structure stability, sediment transport, channel stability, and ice-jam problems due to the construction of the project is discussed in detail. Data on the performance of the project and observations made in the prototype, as well as conclusions and recommendations based on the monitoring effort, are reported herein.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Monitoring of Completed Breakwaters at Cattaraugus Creek Harbor, New York



    Erschienen in:

    Erscheinungsdatum :

    1991


    Format / Umfang :

    11794374


    Medientyp :

    Report


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Klassifikation :


    Monitoring Completed Coastal Projects: Operational Assessment of Floating Breakwaters, Puget Sound, Washington

    Nelson, Eric E. / Hemsley, James Michael | HENRY – Bundesanstalt für Wasserbau (BAW) | 1988

    Freier Zugriff



    Detached Breakwaters

    Fröhle, Peter / Kuratorium für Forschung im Küsteningenieurwesen (KFKI) | HENRY – Bundesanstalt für Wasserbau (BAW) | 2008

    Freier Zugriff

    Floating Breakwaters

    Hales, L. Z. | TIBKAT | 1981