The system obtains SOH (200, 210, 220) of a first component (130), where the SOH (200, 210, 220) indicates a difference between a current state of the first component (130) and a state of a rated new component (130). The system obtains historical use of the first component (130). Based on the SOH (200, 210, 220) and the historical use, the system determines a future SOH (200, 210, 220) of the first component (130). The system obtains an indication of a requested SOH (200, 210, 220) of the first component (130). Based on the indication of the requested SOH (200, 210, 220) and the future SOH (200, 210, 220) of the first component (130), the system determines a first time indicating when the first component (130) will need to be replaced. The system determines a second time indicating when the second component (130) is available to replace the first component (130), where the second time occurs before the first time. The system requests a delivery of the second component (130) when the second time is substantially close to the first time.

    Le système obtient un SOH (200, 210, 220) d'un premier composant (130), le SOH (200, 210, 220) indiquant une différence entre un état actuel du premier composant (130) et un état d'un nouveau composant nominal (130). Le système obtient une utilisation historique du premier composant (130). Sur la base du SOH (200, 210, 220) et de l'utilisation historique, le système détermine un futur SOH (200, 210, 220) du premier composant (130). Le système obtient une indication d'un SOH demandé (200, 210, 220) du premier composant (130). Sur la base de l'indication du SOH demandé (200, 210, 220) et du futur SOH (200, 210, 220) du premier composant (130), le système détermine un premier temps indiquant le moment où le premier composant (130) doit être remplacé. Le système détermine un second temps indiquant le moment où le second composant (130) est disponible pour remplacer le premier composant (130), où le second temps se produit avant le premier temps. Le système demande une distribution du second composant (130) lorsque le second temps est sensiblement proche du premier temps.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    OPTIMIZING BATTERY DELIVERY AND REPLACEMENT


    Weitere Titelangaben:

    OPTIMISATION DE DISTRIBUTION ET DE REMPLACEMENT DE BATTERIE


    Beteiligte:
    HA CHRISTOPHER (Autor:in) / RAMASWAMY SRIDHAR (Autor:in) / KHALIL SADIA (Autor:in) / GREEN CHRISTOPHER (Autor:in) / FIELDING DAMON (Autor:in) / FEETHAM SARA (Autor:in) / TUCKMANTEL PHILIPPE (Autor:in) / JONES DARYL (Autor:in) / HUERTA DIANA (Autor:in) / RODRIGUEZ MARK (Autor:in)

    Erscheinungsdatum :

    06.02.2025


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Englisch


    Klassifikation :

    IPC:    B60L PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES , Antrieb von elektrisch angetriebenen Fahrzeugen



    OPTIMIZING BATTERY DELIVERY AND REPLACEMENT

    HA CHRISTOPHER / RAMASWAMY SRIDHAR / KHALIL SADIA et al. | Europäisches Patentamt | 2025

    Freier Zugriff


    Battery replacement mechanism, battery replacement system, and battery replacement method

    CHENG HSU-CHIH / CHEN YING-CHIEH / HSIEH CHI-TONG et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Battery replacement equipment, battery replacement station and battery replacement method

    ZHANG JIANPING / HUANG CHUNHUA | Europäisches Patentamt | 2024

    Freier Zugriff

    Battery replacement equipment, battery replacement station and battery replacement method

    ZHANG JIANPING / HUANG CHUNHUA | Europäisches Patentamt | 2024

    Freier Zugriff