An elevator construction arrangement comprises a hoistway (1); an elevator car (10), a counterweight (13), car guide rails (8) for guiding the car, and counterweight guide rails (9) for guiding the counterweight; an elevator hoisting machinery (30) and a suspension roping (31) arranged to suspend the car (10) and the counterweight (13) during construction time use; a protection deck (2) mounted within the hoistway (1) during an elevator installation in the hoistway; a hoist device (6) configured to move the car (10) or at least parts of the car below the protection deck (2), the car being guided on the car guide rails (8); wherein the arrangement comprises at least one guide rail (8; 9) with mounting perforations such as mounting holes made at the construction site for the machinery (30) and/or for at least one rope suspender (32, 32') in connection with an elevator jump. A method for installing an elevator during construction of a building (100).

    Un agencement de construction d'ascenseur comprend une cage d'ascenseur (1) ; une cabine d'ascenseur (10), un contrepoids (13), des rails de guidage de cabine (8) permettant de guider la cabine, et des rails de guidage de contrepoids (9) permettant de guider le contrepoids ; une machine de levage d'ascenseur (30) et un câble de suspension (31) conçu pour suspendre la cabine (10) et le contrepoids (13) pendant l'utilisation du temps de construction ; un pont de protection (2) monté à l'intérieur de la cage d'ascenseur (1) pendant une installation d'ascenseur dans la cage d'ascenseur ; un dispositif de levage (6) configuré pour déplacer la cabine (10) ou au moins des parties de la cabine au-dessous du pont de protection (2), la cabine étant guidée sur les rails de guidage de cabine (8) ; l'agencement comprenant au moins un rail de guidage (8 ; 9) avec des perforations de montage telles que des trous de montage réalisés au niveau du site de construction pour la machine (30) et/ou pour au moins un dispositif de suspension de câble (32, 32') en liaison avec un saut d'ascenseur. Procédé d'installation d'un ascenseur pendant la construction d'un bâtiment (100).


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    ELEVATOR CONSTRUCTION ARRANGEMENT AND METHOD


    Weitere Titelangaben:

    AGENCEMENT ET PROCÉDÉ DE CONSTRUCTION D'ASCENSEUR


    Beteiligte:
    RÄSÄNEN MATTI (Autor:in) / LANZ OTTO (Autor:in) / KUKKOLA MIKKO (Autor:in) / IJÄS MIKA (Autor:in) / HAAPANIEMI MARKKU (Autor:in) / UUSITALO JUKKA (Autor:in) / ARMINEN MARTTI (Autor:in)

    Erscheinungsdatum :

    14.11.2024


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Englisch


    Klassifikation :

    IPC:    B66B Aufzüge , ELEVATORS



    ELEVATOR CONSTRUCTION ARRANGEMENT AND METHOD

    IJÄS MIKA / RÄSÄNEN MATTI / KUKKOLA MIKKO et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Construction arrangement of elevator and method for constructing elevator

    KUKLA MARTIN / IJAS MICHAEL / RASANEN MATTI et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Elevator car and construction-time elevator arrangement and method

    MÄKIMATTILA SIMO / HAGSTRÖM EMIL | Europäisches Patentamt | 2021

    Freier Zugriff

    ELEVATOR CAR AND CONSTRUCTION-TIME ELEVATOR ARRANGEMENT AND METHOD

    MÄKIMATTILA SIMO / HAGSTRÖM EMIL | Europäisches Patentamt | 2021

    Freier Zugriff

    Method of constructing elevator and elevator arrangement during construction

    RASANEN MATTI / HAAPANIEMI MARKKU / OLA LANTZ et al. | Europäisches Patentamt | 2023

    Freier Zugriff