A semi-submersible lifting and disassembly platform and a control method therefor. The platform comprises a larboard floating body (102), a starboard floating body (101), two larboard poles (202), two starboard poles (201), and a deck box (3); both the larboard floating body (102) and the starboard floating body (101) are provided with several normal ballast tanks (15) and several fast ballast tanks (14); the tops of the fast ballast tanks (14) are in communication with a compressed air ballast system; each of the larboard poles (202) and the starboard poles (201) is provided with a pole-side ballast tank (13); the tops of the pole-side ballast tanks (13) are in communication with the compressed air ballast system; and each of the normal ballast tanks (15), the fast ballast tanks (14), and the pole-side ballast tanks (13) is provided with a water pump ballast system.

    La présente invention concerne une plateforme de levage et de démontage semi-submersible et un procédé de commande associé. La plateforme comprend un corps flottant bâbord (102), un corps flottant tribord (101), deux pôles bâbord (202), deux pôles tribord (201), et une boîte de pont (3) ; à la fois le corps flottant bâbord (102) et le corps flottant tribord (101) sont pourvus de plusieurs réservoirs de ballast normaux (15) et de plusieurs réservoirs de ballast rapides (14) ; les sommets des réservoirs de ballast rapides (14) sont en communication avec un système de ballast d'air comprimé ; chacun des pôles bâbord (202) et des pôles tribord (201) est pourvu d'un réservoir de ballast côté pôle (13) ; les sommets des réservoirs de ballast côté pôle (13) sont en communication avec le système de ballast à air comprimé ; et chacun des réservoirs de ballast normaux (15), des réservoirs de ballast rapides (14), et des réservoirs de ballast côté pôle (13) étant pourvus d'un système de ballast de pompe à eau.

    一种半潜式起重拆解平台及其控制方法,平台包括左舷浮体(102)、右舷浮体(101)、两个左舷立柱(202)、两个右舷立柱(201)、甲板盒(3),左舷浮体(102)与右舷浮体(101)中均布置有若干普通压载水舱(15)及若干快速压载水舱(14),快速压载水舱(14)顶部与压缩空气压载系统连通,左舷立柱(202)、右舷立柱(201)中分别设置有柱边压载水舱(13),柱边压载水舱(13)顶部与压缩空气压载系统连通;普通压载水舱(15)、快速压载水舱(14)以及柱边压载水舱(13)上都设有水泵压载系统。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    SEMI-SUBMERSIBLE LIFTING AND DISASSEMBLY PLATFORM AND CONTROL METHOD THEREFOR


    Weitere Titelangaben:

    PLATEFORME DE LEVAGE ET DE DÉMONTAGE SEMI-SUBMERSIBLE ET PROCÉDÉ DE COMMANDE ASSOCIÉ
    一种半潜式起重拆解平台及其控制方法


    Beteiligte:
    LIU JIANCHENG (Autor:in) / WU HAIJIAN (Autor:in) / ZHU YONGMEI (Autor:in) / ZHENG HEHUI (Autor:in) / CHEN LINGXIANG (Autor:in) / HE LI (Autor:in) / CHEN YUN (Autor:in) / ZHANG JIAN (Autor:in) / TANG WENXIAN (Autor:in) / YIN BAOJI (Autor:in)

    Erscheinungsdatum :

    2022-06-09


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS



    ASYMMETRIC SEMI-SUBMERSIBLE DISASSEMBLY PLATFORM

    LIU JIANCHENG / XU LIXIN / WU HAIJIAN et al. | Europäisches Patentamt | 2022

    Freier Zugriff

    Lifting balance compensation system of semi-submersible platform lifting machine

    ZHANG ZHENZHU / ZHANG XINSHENG / LI MINGPENG et al. | Europäisches Patentamt | 2015

    Freier Zugriff

    Rescue and salvage ship with semi-submersible lifting platform

    WEI MANHUI / WANG KELIANG / LIU JIAN et al. | Europäisches Patentamt | 2021

    Freier Zugriff

    SEMI-SUBMERSIBLE PLATFORM

    WANG TAO / JIANG XIAOFENG / LU RENJIAN et al. | Europäisches Patentamt | 2017

    Freier Zugriff

    Novel semi-submersible lifting platform and offshore wind power hoisting method

    WANG KUN / PENG CHANGYANG / YANG XUELIANG et al. | Europäisches Patentamt | 2023

    Freier Zugriff