A method of monitoring a conveyance apparatus within a conveyance system including: obtaining a first health level of a conveyance system at a first time; receiving customer feedback regarding operation of the conveyance system proximate the first time from a customer; and adjusting a threshold health level of the conveyance system to be less than or equal to the first health level of the conveyance system in response to the customer feedback.
CUSTOMER BEHAVIOR DRIVEN PREDICTIVE MAINTENANCE
14.01.2021
Patent
Elektronische Ressource
Englisch
IPC: | B66B Aufzüge , ELEVATORS |
A cost driven predictive maintenance policy for structural airframe maintenance
British Library Online Contents | 2017
|Europäisches Patentamt | 2024
|TIBKAT | 1980