The system can include: a motion planner and a switch management system. The system can optionally include or operate in conjunction with a vehicle controller, a user interface (UI), and a track data system. However, the system 100 can additionally or alternatively include any other suitable set of components. The system functions to facilitate vehicle control and/or manage authority, in the form of exclusive track reservations, within a rail network. Additionally or alternatively, the system can function to manage switch positions (and/or operation based on switch positions) within a rail network.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Railway switch management system and/or method


    Beteiligte:
    GREENBAUM MARC (Autor:in) / ANEZ ANDREA (Autor:in) / DUNN PATRICK (Autor:in)

    Erscheinungsdatum :

    08.10.2024


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Englisch


    Klassifikation :

    IPC:    B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC



    RAILWAY SWITCH MANAGEMENT SYSTEM AND/OR METHOD

    GREENBAUM MARC / ANEZ ANDREA / DUNN PATRICK | Europäisches Patentamt | 2024

    Freier Zugriff

    RAILWAY SWITCH MANAGEMENT SYSTEM AND/OR METHOD

    GREENBAUM MARC / ANEZ ANDREA / DUNN PATRICK | Europäisches Patentamt | 2024

    Freier Zugriff

    Switch monitoring and railway line management

    DUAN NING / HU KE / LI LI et al. | Europäisches Patentamt | 2016

    Freier Zugriff

    SWITCH MONITORING AND RAILWAY LINE MANAGEMENT

    DUAN NING / HU KE / LI LI et al. | Europäisches Patentamt | 2016

    Freier Zugriff

    RAILWAY SWITCH

    SAKURAI IKUO | Europäisches Patentamt | 2016

    Freier Zugriff